Emma timber house with swimming pool

Timber houses · costs

Timber houses: how much per square metre?

The price of a timber house is not a single number: it depends on the building system, the finishing level and what is included. Here are the items that really matter, so you can compare quotes correctly.

What changes the price

01

Building system

X-LAM (solid cross-laminated panels) or timber frame (light structure with insulation inside the walls): the amount of timber, times and performance change. A mixed system is often the best compromise.

02

Delivery level

From advanced shell (structure, envelope, roof and windows) to turnkey with systems and finishes: this is what moves the price per m² the most.

03

Shape and size

Storeys, overhangs, large glazing and clear spans need more material and calculations; a compact plan costs less per m² than a complex one.

04

Energy performance

Insulation thickness, external insulation, ventilated façade and windows set the energy class and future running costs.

05

Systems and finishes

Heat pump, solar panels, mechanical ventilation, floors and claddings: choices that weigh on the total as much as the structure.

06

Site and location

Access for vehicles, seismic zone, snow load and distance from the plant affect transport and assembly.

What is almost never included in the price per m²

  • Land and fees: plot purchase, development charges and permits

  • Foundations: concrete slab or footings, depending on the ground

  • Design and site supervision: unless included in the offer

  • Connections and outdoor works: utilities, fences, garden and paths

Our timber houses

Frequently asked questions

Does a timber house cost less than a masonry one?

For the same performance the cost is often similar; the advantage lies in much shorter building times, the precision of prefabrication and lower energy use over the years.

X-LAM or timber frame?

X-LAM offers mass, solidity and excellent seismic behaviour; timber frame is lighter and starts from lower costs. We assess the right system with you, mixed systems included.

How long does it take to build?

The structure is produced in our plant and assembled on site in a few weeks; overall times depend mainly on permits, systems and finishes.

Why trust us

Figures, certifications and public works that speak for us.

1905
Year founded
944
Structures built
9.000 m³
Timber processed every year
  • CE0407-CPR-1459
  • ISO 9001n. 3919760
  • PEFCCSQA-PEFC-COC-54966
  • STCAttestato 22/22-CL
Attachments (optional)

By submitting you consent to the processing of your data to handle your request.