X-LAM roof of a timber house

Bolzano · South Tyrol

Prefab timber houses in Bolzano and South Tyrol.

In South Tyrol timber is at home and the rules are strict: new buildings must meet the energy standards of the CasaClima (KlimaHaus) Agency and withstand Alpine snow loads. We design prefab timber houses built around these requirements, in Bolzano and across the province.

Pencil sketch of a two-storey timber house with X-LAM walls and roof

How your prefab timber house is made

01

Designed for CasaClima standards

Insulated envelope without thermal bridges, airtightness and high-performance windows: the house is designed with your engineer for the CasaClima class required by the town.

02

Snow and altitude

Roof and structure are sized on the snow load of the site's altitude, from Bolzano and Merano to the highest valleys.

03

Prefabricated in our plant

Walls, floors and roof are made to measure in our plant, sheltered from rain and site conditions: they reach the site ready to assemble, with reliable times and millimetre precision.

04

X-LAM, timber frame or mixed

Solid X-LAM panels for strength and seismic behaviour, timber frame for lightness and lower costs, or a mixed system: we choose the right solution for your project with you.

What our work includes

  • Structural design: timber structure calculated on the seismic, wind and snow loads of your town

  • Production: glulam and X-LAM panels made by Emma Industrie

  • Transport and assembly: delivery to site and erection by specialised teams

  • Advanced shell or turnkey: you decide how far we go

Our prefab timber houses

Frequently asked questions

Are your houses CasaClima certified?

CasaClima certification applies to each building and is issued by the CasaClima Agency at the end of works: we design the envelope with your engineer to reach the required class.

Do you work across the province of Bolzano?

Yes, in Bolzano, Merano, Bressanone, Brunico and the valleys, with transport and assembly organised by us.

How much does a prefab timber house cost?

It depends on the building system, floor area, finishing level and location. The cost-per-m² page explains what changes the price; for an exact figure we prepare a free quote on your project.

How long does assembly take?

The structure is produced in our plant and assembled on site in a few weeks; overall times depend mainly on permits, systems and finishes.

Why trust us

Figures, certifications and public works that speak for us.

1905
Year founded
944
Structures built
9.000 m³
Timber processed every year
  • CE0407-CPR-1459
  • ISO 9001n. 3919760
  • PEFCCSQA-PEFC-COC-54966
  • STCAttestato 22/22-CL
Attachments (optional)

By submitting you consent to the processing of your data to handle your request.