Emma timber house with garden

Campania · prefab houses

Prefab timber houses in Campania.

In Campania most towns are in seismic zone 1 or 2 and plots are often small or sloping: a prefab timber house is light, goes up in a few weeks and needs smaller foundations. We design, make and assemble them across the region.

Pencil sketch of a two-storey timber house with X-LAM walls and roof

How your prefab timber house is made

01

Light on difficult plots

Timber weighs a fraction of masonry: less load on the foundations, ideal on sloping or hillside ground or where site space is tight.

02

Several storeys too

With X-LAM we build single and two-family houses and small timber apartment blocks, also as an extra storey on existing buildings after structural checks.

03

Prefabricated in our plant

Walls, floors and roof are made to measure in our plant, sheltered from rain and site conditions: they reach the site ready to assemble, with reliable times and millimetre precision.

04

X-LAM, timber frame or mixed

Solid X-LAM panels for strength and seismic behaviour, timber frame for lightness and lower costs, or a mixed system: we choose the right solution for your project with you.

What our work includes

  • Structural design: timber structure calculated on the seismic, wind and snow loads of your town

  • Production: glulam and X-LAM panels made by Emma Industrie

  • Transport and assembly: delivery to site and erection by specialised teams

  • Advanced shell or turnkey: you decide how far we go

Our prefab timber houses

Frequently asked questions

Can you build in timber in Campania's seismic zones?

Yes: the structure is calculated on the town's seismic zone to the Italian building code, and timber's lightness and ductility perform very well in earthquakes.

Do you also build timber roof extensions?

Yes, after the engineer has checked the existing building: timber adds little weight and is the most used solution for extra storeys.

How much does a prefab timber house cost?

It depends on the building system, floor area, finishing level and location. The cost-per-m² page explains what changes the price; for an exact figure we prepare a free quote on your project.

How long does assembly take?

The structure is produced in our plant and assembled on site in a few weeks; overall times depend mainly on permits, systems and finishes.

Why trust us

Figures, certifications and public works that speak for us.

1905
Year founded
944
Structures built
9.000 m³
Timber processed every year
  • CE0407-CPR-1459
  • ISO 9001n. 3919760
  • PEFCCSQA-PEFC-COC-54966
  • STCAttestato 22/22-CL
Attachments (optional)

By submitting you consent to the processing of your data to handle your request.