Emma timber house with garden

Tuscany · prefab houses

Prefab timber houses in Tuscany.

Hills, villages and coast: in Tuscany a prefab timber house can look the way the landscape requires, with render, stone or exposed timber, and inside all the comfort of a modern X-LAM or timber-frame structure.

Pencil sketch of a two-storey timber house with X-LAM walls and roof

How your prefab timber house is made

01

Finishes that suit the landscape

Timber structure, but rendered, stone or timber-clad façade and a pitched roof with clay tiles: with your designer we define finishes compatible with local landscape restrictions.

02

From the coast to the Apennines

Every structure is calculated on the town's seismic, wind and snow loads, from Versilia and the Maremma to Garfagnana, Lunigiana and Casentino.

03

Prefabricated in our plant

Walls, floors and roof are made to measure in our plant, sheltered from rain and site conditions: they reach the site ready to assemble, with reliable times and millimetre precision.

04

X-LAM, timber frame or mixed

Solid X-LAM panels for strength and seismic behaviour, timber frame for lightness and lower costs, or a mixed system: we choose the right solution for your project with you.

What our work includes

  • Structural design: timber structure calculated on the seismic, wind and snow loads of your town

  • Production: glulam and X-LAM panels made by Emma Industrie

  • Transport and assembly: delivery to site and erection by specialised teams

  • Advanced shell or turnkey: you decide how far we go

Our prefab timber houses

Frequently asked questions

Can a timber house look like a traditional Tuscan house?

Yes: timber is the structure, while outside you can use render, stone and clay-tile roofs, as many local regulations require.

Do you work in every Tuscan province?

Yes, in Florence, Arezzo, Grosseto, Livorno, Lucca, Massa-Carrara, Pisa, Pistoia, Prato and Siena.

How much does a prefab timber house cost?

It depends on the building system, floor area, finishing level and location. The cost-per-m² page explains what changes the price; for an exact figure we prepare a free quote on your project.

How long does assembly take?

The structure is produced in our plant and assembled on site in a few weeks; overall times depend mainly on permits, systems and finishes.

Why trust us

Figures, certifications and public works that speak for us.

1905
Year founded
944
Structures built
9.000 m³
Timber processed every year
  • CE0407-CPR-1459
  • ISO 9001n. 3919760
  • PEFCCSQA-PEFC-COC-54966
  • STCAttestato 22/22-CL
Attachments (optional)

By submitting you consent to the processing of your data to handle your request.